Responsibility LedgerAppend-only · Dated · Signed

Claimant scorecard · AERS v2.1 · Calibrating

FERC

1 claim tracked in the Responsibility Ledger. 1 pending grade.


AERS

Insufficient closed grades

Pending

1

Open horizons

Closed

0

Graded outcomes

First tracked

Jun 24, 2026

Open horizons

  • FERC: Issued June 18 orders directing six regional grid operators to submit revised large-load interconnection frameworks within 60 days and resource adequacy reports within 30 days

    Grade by Jun 18, 2027· 1 year·Entry 047·Materiality 3/5

About this scorecard

The AI Execution Risk Score (AERS) is a 0-100 metric quantifying the gap between FERC’s public AI claims and demonstrated delivery. Higher AERS = stronger track record. Each claim above is drawn from a primary source linked in the original Ledger entry; the horizon date is when the claim becomes graded under the published methodology. Materiality is the editor’s assessment of the claim’s formality from 1 (PR statement) to 5 (earnings call or SEC filing).

AERS v2.1 · Methodology in active calibration · Not investment advice.